OFFER
References
SKAWINA Power Plant
Skawina
Installed boilers:
Boiler Type | Qty | Capacity [t/h] /Output Power [MW] | Steam Temperature [oC] | Steam Pressure [MPa] | Fuel | Start-up Year |
---|---|---|---|---|---|---|
OP | 5 | 230 t/h | 500 | 9,0 | bituminous coal | 1958 - 1959 |
OP | 4 | 210 | 530 | 9,0 | bituminous coal | 1960 - 1961 |
Installed FGD plants:
Boiler | Thermal or electric output | Flue gas quantity [mn3/h] | Sulphur content in fuel in % | Desulphurisation efficiency in % | Absorbent | Final product | Start-up Year |
---|---|---|---|---|---|---|---|
K8-K11 (OP-210) | 4 x 165 MWel | 550 000 | śr. 1,0 max. 1,2 | 89 | burnt lime / hydrated lime | ash and desulphurisation products | 2008 |
K5 i K6 (OP-230) | 2 x 167 MWel | 630 000 | śr. 1,0 max. 1,3 | 92 | hydrated lime | ash and desulphurisation products | 2008 |
Installed dust extraction equipment:
Block No / boiler type | Guaranted dust concentration [mg/m^3] | Measured dust concentration [mg/m^3] | Start-up Year |
---|---|---|---|
8÷11 / OP-210 | <20 | 8 | 2004 |
5÷6 / OP-230 | <20 | 7÷9 | 2005 |
Installed boiler modernization / NOx reduction:
Boiler Type | Boiler number | Description | Reduction [%] | NOx emission [g/GJ] | Start-up Year |
---|---|---|---|---|---|
OP-230 | Boiler No 5 | Tangential furnace, conventional burners, OFA nozzle system | 45 | <160 | 1994 |
OP-230 | Boiler No 6 | Tangential furnace, low-emission burners | <170 | 1994 | |
OP-230 | Boiler No 4 | Tangential furnace, low-emission burners | <170 | 1995 | |
OP-230 | Boiler No 3 | Tangential furnace, low-emission burners, OFA nozzle system | <170 | 1995 |