rafako logo
polish version
  • Advanced search
  • Site map
  • RSS
    • Mission
      Activity
      Management Board
      Company basic documents
      Quality, Environment, Safety
      Photo gallery
      Interesting links
    • Boilers
      Enviroment protection plants
      Waste Thermal Treatment Plants
      Service
      Production of boiler components
      Heat exchangers
      References
      Liquidation of stocks
      Order the publication
      Survey
    • Current events
      Press releases
      Company in media
      Contact for media
    • Justyna Kowalczyk
      Bieg na Igrzyska 2010/2011
      Bieg na Igrzyska 2011/2012
    • Events calendar
      Current reports
      Periodic reports
      Basic financial data
      Stock-exchange listing
      Authorities
      Shareholders
      Shareholders General Meetings
      Share information
      Corporate governance
      Stock analysts
      Contact data for investors
    • Jobs offers
      Application form
      konkurs
      Praktyki
    • Contacts
      Contact form
      Road access
  • Products
  • Boilers
    • Hard coal
      • Stoker fired boilers
      • Pulverised fuel hot water boilers
      • Pulverised fuel fired boilers with steam drum
      • Pulverised fuel fired, once through, steam boilers
      • Fluidised bed boilers
    • Lignite
    • Oil, gas, fuels combination
    • Waste derived fuel
    • Exhaust gas down - stream gas turbine
    • Boiler views
  • Enviroment protection plants
  • Waste Thermal Treatment Plants
  • Service
  • Production of boiler components
  • Heat exchangers
  • References
  • Liquidation of stocks
  • Order the publication
  • Survey
  • Home Page
  • Products
  • Boilers
  • Hard coal
  • Pulverised fuel hot water boilers

Pulverised fuel hot water boilers

Pulverised fuel fired, hot water boilers are highly specific for Polish heat generating sector. They were constructed mainly in Sixties and Seventies, when cogeneration was not an absolute economic requirement. Although these boilers are meant only for district heating or supply of hot process water, they are very numerous and almost all were manufactured by RAFAKO. The largest among them, WP-200 type boilers have a capacity of 200 Gcal/h (233 MW).

To send your query to our consultants, fill in the contact form below.!

more
  • WP-70
  • WP-120
  • WP-200

WP-70

Boiler type: Forced flow
Firing method: Tangential
Max. continuous rating: 81 MW
Water temperature inlet/outlet: 70/155°C
Water pressure inlet/outlet: 2,5 MPa
Gross efficiency: 84%
Fuel type: Bituminous coal
Net calorific value: 21 MJ/kg
Additional informations: Hot water boiler
Installations: Będzin CHP Plant (1)
Białystok CHP(2)
Gdańsk 2 CHP Plant (2)
Gliwice CHP Plant (3)
Gorzów CHP Plant (1)
"Manifest Lipcowy" Coal Mine (1)
Kraków - Łęg CHP Plant (1)
Łagisza Power Plant (2)
Lublin CHP Plant (2)
Lublin Car Factory (2)
Lublin Cooper Mine and Smeler (2)
Oświęcim Chemical Plant (1)
Stalowa Wola Power Plant (1)
Tarnów Chemical Plant (1)
Wrocław CHP Plant (2)

Zoom
Zoom
Zoom
Zoom
Zoom
Zoom

WP-120

Boiler type: Forced flow
Firing method: Tangential
Max. continuous rating: 140 MW
Water temperature inlet/outlet: 70/155°C
Water pressure inlet/outlet: 2,5 MPa
Gross efficiency: 84%
Fuel type: Bituminous coal
Net calorific value: 21 MJ/kg
Additional informations: Hot water boiler
Installations: Żerań CHP Plant (4)
Siekierki CHP Plant (3)
Kraków Łęg CHP Plant (5)
Tychy CHP Plant (4)
Bielsko-Biała CHP Plant (1)
Gorzów CHP Plant (2)
Wrocław CHP Plant (3)
Bydgoszcz 2 CHP Plant (2)
Szczecin CHP Plant (2)
Gdańsk 2 CHP Plant (2)
Chorzów CHP Plant (2)
Łódź 4 CHP Plant (4)
Lublin 4 CHP Plant (2)
Gdynia 3 CHP Plant (1)
Będzin CHP Plant (2)
Pomorzany CHP Plant (2)
Elbląg CHP Plant (1)
Katowice-Dąbrówka CHP Plant (2)
Warszawa-Kawęczyn CHP Plant (2)
Toruń CHP Plant (2)
Stalowa Wola Power Plant (1)
Opole Power Plant (2)
Rzeszów CHP Plant (2)
Radom CHP Plant (2)
Kielce CHP Plant (2)
Zabrze CHP Plant (2)
FIAT Auto Poland Bielsko-Biała (1)
Huta Katowice Steel Mill (1)
Otrowiec Świętokrzyski Steel Mill (1)
Lublin Truck Factory(1)

Zoom
Zoom
Zoom
Zoom
Zoom
Zoom
Zoom
Zoom

WP-200

Boiler type: Forced flow
Firing method: Tangential
Max. continuous rating: 233 MW
Water temperature inlet/outlet: 115/160°C
Water pressure inlet/outlet: 2,5 MPa
Gross efficiency: 87%
Fuel type: Bituminous coal
Net calorific value: 19,7 MJ/kg
Additional informations: Hot water boiler
Installations: Siekierki-Katowice CHP Plant (1)
Siekierki CHP Plant (1)
Kawęczyn CHP Plant (2)

Zoom
Zoom
  • Print  |  Add to bookmarks
  • © RAFAKO S.A. | ul. Łąkowa 33 47-400 Racibórz | tel. +48 032 410 10 00 | info@rafako.com.pl
  • Legal notice | Privacy Policy | Created by ENIGMATIS POLSKA