rafako logo
polish version
  • Advanced search
  • Site map
  • RSS
    • Mission
      Activity
      Management Board
      Company basic documents
      Quality, Environment, Safety
      Photo gallery
      Interesting links
    • Production of boiler components
      Boilers
      Enviroment protection plants
      Service
      References
      Heat exchangers
      Liquidation of stocks
      Order the publication
      Survey
    • Current events
      Press releases
      Company in media
      Contact for media
    • Justyna Kowalczyk
    • Events calendar
      Current reports
      Periodic reports
      Basic financial data
      Stock-exchange listing
      Authorities
      Shareholders
      Shareholders General Meetings
      Share information
      Corporate governance
      Stock analysts
      Contact data for investors
    • Jobs offers
      Application form
      konkurs
    • Contacts
      Contact form
      Road access
  • Products
  • Production of boiler components
  • Boilers
    • Hard coal
    • Lignite
      • Pulverised lignite fired boilers with steam drum
      • Pulverised lignite fired once-through boilers
      • Fluidised bed boilers
    • Oil, gas, fuels combination
    • Waste derived fuel
    • Exhaust gas down - stream gas turbine
    • Boiler views
  • Enviroment protection plants
  • Service
  • References
  • Heat exchangers
  • Liquidation of stocks
  • Order the publication
  • Survey
  • Home Page
  • Products
  • Boilers
  • Lignite
  • Pulverised lignite fired once-through boilers

Pulverised lignite fired once-through boilers

Two BB-1880 once-through boilers operated in Nikola Tesla Power Plant in Yogoslavia are the largest boilers ever manufactured by RAFAKO. Bełchatów Power Plant which operates 12 BB-1150 boilers is however our most important reference within this field (360 MW units).
Nowadays, the largest boilers constructed are the ones with supercritical steam parameters. RAFAKO has already delivered numerous elements of such boilers for Niederaussem Power Plant (Germany) and Florina Power Plant (Greece). Currently, within a consortium with ALSTOM, RAFAKO S.A is executing a contract for design and delivery of a 1345 t/h boiler with supercritical steam parameters for Pątnów II Power Plant.

To send your query to our consultants, fill in the contact form below.!

more
  • BB-1880
  • BB-1345
  • BB-1150
  • BB-920

BB-1880

Boiler type: Once-through
Firing method: Tangential
Max. continuous rating: 520 kg/s
Live steam temperature outlet: 540°C
Live steam pressure outlet: 18,3 MPa
Reheat steam temperature inlet/outlet: 335/540°C
Reheater steam pressure outlet: 4,3 MPa
Feedwater temperature: 259°C
Gross efficiency: 88,3%
Fuel type: Lignite
Net calorific value: 6,7 MJ/kg
Additional informations: Steam boiler
Installations: Nikola Tesla B Power Plant - Yugoslawia (2)

Zoom

BB-1345

Boiler type: Once-through
Firing method: Tangential
Max. continuous rating: 374 kg/s
Live steam temperature outlet: 544°C
Live steam pressure outlet: 26,6 MPa
Reheat steam temperature inlet/outlet: 308/566°C
Feedwater temperature: 273°C
Gross efficiency: 90,3%
Fuel type: Lignite
Net calorific value: 8,6 MJ/kg
Additional informations: Steam boiler
Installations: Pątnów II Power Plant (1)

Zoom
Zoom
Zoom
Zoom
Zoom
Zoom
Zoom
Zoom

BB-1150

Boiler type: Once-through
Firing method: Tangential
Max. continuous rating: 320 kg/s
Live steam temperature outlet: 540°C
Live steam pressure outlet: 18,3 MPa
Reheat steam temperature inlet/outlet: 335/540°C
Reheater steam pressure outlet: 4,2 MPa
Feedwater temperature: 255°C
Gross efficiency: 88%
Fuel type: Lignite
Net calorific value: 8 MJ/kg
Additional informations: Steam boiler
Installations: Bełchatów Power Plant (12)

Zoom
Zoom
Zoom

BB-920

Boiler type: Once-through
Firing method: Tangential
Max. continuous rating: 256 kg/s
Live steam temperature outlet: 543°C
Live steam pressure outlet: 18,2 MPa
Reheat steam temperature inlet/outlet: 335/543°C
Reheater steam pressure outlet: 4,2 MPa
Feedwater temperature: 255°C
Gross efficiency: 87,1%
Fuel type: Lignite
Net calorific value: 6,7 MJ/kg
Additional informations: Steam boiler
Installations: Obrenovac Power Plant - Yugoslawia (1)